Burnham

Page may contain affiliate links. Please see terms for details.

AndyRM

Elder Goth
Fair enough if you can't answer the valid comments made by The Rotherham Bugle

Duplicating something only adds more costs. Move the whole thing if it works, but how does an office in Manchester help Cornwall or Newcastle compared to an office in London.

Taxpayers are paying a huge additional cost so Burnham can get home early on a Friday for the weekend
Unrelated, its reported Burnham flew in government plane to Glasgow and then to Manchester...Journeys that could have been made by rail. so much for net zero.

Or is it some animals are more equal than others and net zero only applies to some people? I'm sure someone could write a book about this sort of behaviour

Terribly sorry, I didn't realise I was meant to.
 

spen666

Veteran
Terribly sorry, I didn't realise I was meant to.

you voluntarily chose to reply to my post - and avoided the points raised - bit like you have now



Strange that isn;t it?
 

BoldonLad

Old man on a bike. Not a member of a clique.
Location
South Tyneside
Weren't they warning the Tories about the exact same things? And doesn't it amount to "warning" that spending too much or borrowing too much is bad, m'kay; and that depending on how you go about it, raising tax rates doesn't necessarily mean collecting more tax?

We're I to guess, I would guess that these truths would be written on the inside of toilet cubicle doors in the treasury by now, in those little clip frames that used to contain car finance adverts.

That's a laffer minute 😂
 

AndyRM

Elder Goth
you voluntarily chose to reply to my post - and avoided the points raised - bit like you have now



Strange that isn;t it?

Not really. You posted something from a lame satirical website, neither inviting nor presenting comment until after.

As it happens there are aspects I agree with of No 10 North, specifically greater visibility outside of Westminster. However it's all a bit half arsed which is frustrating.
 
  • Like
Reactions: C R

BoldonLad

Old man on a bike. Not a member of a clique.
Location
South Tyneside
Not really. You posted something from a lame satirical website, neither inviting nor presenting comment until after.

As it happens there are aspects I agree with of No 10 North, specifically greater visibility outside of Westminster. However it's all a bit half arsed which is frustrating.

I am all in favour of “the regions” getting some attention, but, if we are just going to have Westminster incompetence, exported to “the regions”, by the likes of Our regional Mayor, or Mr Houchen, I am not so sure.
 

icowden

Pharaoh
I am all in favour of “the regions” getting some attention, but, if we are just going to have Westminster incompetence, exported to “the regions”, by the likes of Our regional Mayor, or Mr Houchen, I am not so sure.

Yeah - I still want to know what he's getting out of the freeport business deal. There's something shady somewhere there.
 

secretsqirrel

spiteful class warrior
An introduction to the transition for the House of Parliament closing?

Might well be…

The two main delivery options for the full-scale restoration are:
    • Full Decant: Both the House of Commons and the House of Lords vacate the building. Cost: £11.5bn to £15.6bn. Duration: 19 to 24 years.
    • Staged Decant: Parliament remains on-site with rotating closures, requiring significantly longer construction times. Cost: Up to £39.2bn. Duration: 38 to 61 years.
Because of the crumbling state of the building—with routine maintenance and fire-watch operations already costing £1.5 million a week—delays are adding up to £350 million to the bill each year.
 
OP
OP
briantrumpet

briantrumpet

Timewaster
An introduction to the transition for the House of Parliament closing?

A rather nice corrective to this kind of London-centric thinking. Despite it being a looooong way from Devon, I'm not going to complain.

1784916990293.png
 

UglyWithaSidePart

Active Member
Might well be…

The two main delivery options for the full-scale restoration are:
    • Full Decant: Both the House of Commons and the House of Lords vacate the building. Cost: £11.5bn to £15.6bn. Duration: 19 to 24 years.
    • Staged Decant: Parliament remains on-site with rotating closures, requiring significantly longer construction times. Cost: Up to £39.2bn. Duration: 38 to 61 years.
Because of the crumbling state of the building—with routine maintenance and fire-watch operations already costing £1.5 million a week—delays are adding up to £350 million to the bill each year.

I can't see how that much cost is defendable.
 
Top Bottom